Consultation on Stage 2, The Parade Bucklands Beach

The Parade on Bucklands Beach is a popular destination for families and local residents. After years of complaints and concerns from local residents about unsafe driving, the Howick Local Board asked Auckland Transport to improve safety through speed calming.

In October 2024, construction was completed on Stage One of the improvements which (based on public consultation) included one raised crossing and three speed bumps.

Phase two will continue at five locations chosen based on pedestrian demand, traffic surveys, and safety analysis.

Site 1: Devon Road and 23 The Parade
🚧 install a new pram crossing with kerb buildouts on Devon Road
🚧 install new side islands and refuge island outside 23 The Parade

Site 2: 41 The Parade
🚧 install new side islands with pram crossings

Site 3: Wharf Road intersection
🚧 install additional zebra crossings along The Parade at existing raised intersection
🚧 install new lighting

Site 4: 55 The Parade
🚧 install new side islands with pram crossings
🚧 install small section of footpath to connect to Grangers Point

Site 5: Laings Road
🚧 install splitter island and formalise Give-Way control at carpark
extend broken yellow lines around the bends to ensure the required sight line is maintained

As with Stage One, public feedback is helpful for us to understand what you think will work and what needs to change. We made significant changes to Stage One based on public feedback, delivering a more cost effective and safer road for everyone.

Public consultation closes on Friday 8 August. You can find out more, including how to have your say, here: https://haveyoursay.at.govt.nz/the-parade-bucklands-beach-pedestrian-improvements-stage-2