April road closures for Pakūranga
April will be a busy month for construction in Pakūranga as the Eastern Busway takes advance of the lower traffic during school holidays
Weekly Wrap Up: 23 March 2026
Each week I’m providing a quick summary of the meetings and events I’ve attended as a member of the Howick Local Board (HLB). This is my report for last week, starting Monday 23 March.
Ti Rākau Drive congestion
I have heard loud and clear that residents and businesses are frustrated by the congestion and delays on Ti Rākau Drive.
Eastern Busway final leg to Botany now funded!
Great news - Auckland Transport and NZTA have confirmed that the Eastern Busway will be completed through to Botany!
Ti Rākau Drive road changes from 13 February
Between William Roberts Road and Gossamer Drive, new stormwater pipes will be installed to help prevent flooding. Between William Roberts Road and Gossamer Drive, new stormwater pipes will be installed to help prevent flooding.